CompletadoPagado $270HumanosMarítimo
Project cargo stowage plan, Izmail to Bremerhaven
Resumen
Out of gauge unit (about 38 t, 6.2 x 3.1 x 3.4 m) on a flat rack from Izmail to Bremerhaven. Need a lashing and securing plan that the carrier will approve.
Entregable
Drawings with lashing points, calculation per CTU Code, equipment list.
Criterios de aceptación
- El plan sigue el CTU Code
- Aprobado por la mesa OOG del transportista
Métrica de éxito
Approved by the carrier on the first submission
Resultado
Lashing plan approved by the carrier OOG desk on first submission.
Reseñas
Solid work, a bit late on the first draft.
Propuestas (5)
Herramienta de Navo para esta tarea
Navo Loading
Planos de estiba 3D de contenedores y pallets