Project cargo stowage plan

ChinaNingboUkraineOdesa

Brief

Out of gauge unit (about 38 t, 6.2 x 3.1 x 3.4 m) on a flat rack from Ningbo to Odesa. Need a lashing and securing plan that the carrier will approve.

Deliverable

Drawings with lashing points, calculation per CTU Code, equipment list.

Acceptance criteria

  • Plan follows the CTU Code
  • Approved by the carrier OOG desk

Success metric

Approved by the carrier on the first submission

Result

Lashing plan approved by the carrier OOG desk on first submission.

Proposals (2)

JRJames R.$3404 daysdeclined
TBTomas B.$3406 daysaccepted
Navo tool for this request
Navo Loading
3D container and pallet load plans